Compact Fluorescent Lamp (CFL) tubing furnace commissioned
Electroglass recently supplied and commissioned an all-electric furnace with two all-electric forehearths for the production of compact fluorescent lamp (CFL) tubing for a major Far Eastern producer.
High Quality Lead Crystal Project
Featuring our latest design advances for continuous all-electric lead crystal furnaces, Electroglass has recently supplied a 6 tonnes per day installation including gathering bays and feeder channels for a prestigious European crystal manufacturer.
Proven Performance from High Capacity All-Electric Forehearths for Container Glasses
Electroglass 36” wide Electroflex and 48” wide Electroflex-W All-Electric Forehearths continue to demonstrate exceptional energy efficiency and gob temperature/weight control in container production, with similar new projects under active negotiation.
High Capacity All-Electric Melters
The world’s largest all-electric glass melter, with a capacity of over 250 tonnes per day, was designed and commissioned by Electroglass in late 2008, comfortably exceeding its target performance levels in terms of energy efficiency, furnace output and glass quality. Based on current levels of interest and new project activity, this looks set to become the first of a new generation of such large melters.
Electric Boosting and Bubbling Projects
Electroglass’ leadership in high efficiency electric boosting technology and precision control bubbling systems continue to be adopted in almost every sector of the glass industry, with projects ranging from the Americas to the Far East.
Boosting Systems Success
Analysis of Electroglass electric boosting projects shows that over 60% of systems supplied have been repeat orders by existing satisfied customers or their direct associate companies.